The status key
What each label means
Complete and in use today.
Work is in progress on site.
Proposed, subject to approval and change.
Grand Entrance Gate
A 40 ft gated entrance with separate in and out carriageways.
Under constructionWide Roads 40 ft & 30 ft
A 12 m main avenue feeding 9 m branch roads.
Under constructionLandscaped Parks
A central green with planted walkways.
PlannedStreet Lighting
Avenue lighting along the internal road network.
PlannedWater Supply Network
Distribution network laid through the layout.
PlannedDrainage System
Storm and foul drainage along the road network.
PlannedElectricity Infrastructure
Distribution infrastructure through the township.
PlannedChildren’s Play Area
A dedicated play zone beside the central park.
PlannedTree Plantation & Greens
Avenue planting along every internal road.
Planned
The entrance
A single controlled gate
The gate elevation on the sanctioned drawing is 40 ft wide, with separate IN and OUT carriageways either side of a central pier. It is the only vehicular entry to the township.
Under constructionRoads & circulation
12 m and 9 m
- Main avenue 12 m / 40 ft carriageway
- Branch roads 9 m / 30 ft carriageway
- Entrance gate 40 ft wide, separate IN and OUT carriageways
- Plot marking Survey pillars and numbered corner markers
- Commercial 7,404.70 sq.m corner parcel
- Open space Central park and children’s play area
Green environment
The greenery is part of the plan
Avenue planting is proposed along every internal road, with a central park and a children’s play area set aside on the sanctioned layout rather than added later.
All images, renders and walkthroughs on this website are artist’s impressions and are indicative only. They do not represent the completed development and do not form part of any offer or contract.